Drill Core from Third Surface Hole (CS-1815) November 2018
@90.5M, 3rd hole of 2018 surface drill program east of mine (refer to Oct. 24, 2018 news release)
@ 164 m, 3rd hole of 218 surface drill program east of mine (refer to Oct. 24, 2018 news release)
Sampling material in the first level adit
Mineralization in the first level adit
Visible vein in the first level adit
Mineralization in the first level adit
Cobalt bloom visible in first level adit
Core from Summer 2017 Drill Program
Looking towards the opening from the first level adit
Core from Summer 2017 Drill Program
Geo on site examining mineralization on the first level